The ventilation system for module ex 20 is implemented with a heat recovery unit placed above the service area, while the air conditioning is ensured by a fan coil system powered by the existing district heating network.
Module ex 18 features the same types of systems except for the installation study, where an air handling unit is planned; it is also powered by the existing district heating network.