- Home
- Projects
Sava Ingegneria Projects
Sava Ingegneria operates in a wide range of sectors. This is just a selection of the projects and challenges our engineers have tackled, choosing the most innovative and sustainable solutions for each.
Air conditioning system for Alma Mater Studiorum – University of Bologna
- Bologna (BO)
-
Start of work: August 2016
End of work: December 2017 - € 540.000,00
- Design, construction management, and site safety
Construction of the kinetic energy dissipation system for the municipal aqueduct
- Municipality of Forni di Sotto (UD)
-
Start of works: July 2017
End of works: July 2018 - € 300.000,00
- Design and construction management
Udinese Calcio S.p.A. – LOT 1
- Uninese Calcio S.p.A.
-
Start of Works: January 2017
End of Works: February 2019 - € 508.561,88
- Design and construction management